Crane installation method
- Categories:Technology Center
- Author:
- Origin:
- Time of issue:2021-07-22 18:58
- Views:
Crane installation method
- Categories:Technology Center
- Author:
- Origin:
- Time of issue:2021-07-22 18:58
- Views:
The installation team of hoisting machinery can choose manufacturers with installation qualifications to form a one-stop service mode of manufacturing, installation and commissioning. In addition, the selected installation unit must be a professional team with the "Special Equipment Installation (Maintenance) Safety Approval Certificate" issued by the provincial quality and technical supervision department, and have the installation qualification to install the corresponding lifting capacity. After the installation unit is determined, it should assist the installation unit to handle the special equipment start report before installation, and check whether the installation team’s construction organization plan, installation equipment, installation procedures, technical requirements, concealed project acceptance records during the installation process, and self-inspection reports meet the requirements. . After the installation is completed, the installation unit shall be supervised to conduct a comprehensive self-inspection, operation test, and load test. After confirming that the self-inspection is qualified, apply to a special equipment inspection agency for installation acceptance. It can be put into use only after passing the inspection and obtaining the "Safety Use Permit". After the acceptance is passed, the user should archive the relevant technical data such as the crane's random technical data, installation data and inspection report. In the future, periodic inspections, overhauls, transformations, accident records and other data that occurred in the future are also stored in the safety technical file of the lifting machinery.